top of page
Search

Kathy's Korner--SCWA water line

Oct 1, 2025
1 min read

Very quietly the Suffolk County Water Authority has scheduled public hearings on their water line project under the Peconic River along 105 to Northville Tpk and Sound Avenue to Southold. The hearing is about the "Monroe Balancing Test" to determine if Riverhead's zoning and permitting process should apply to this project or whether SCWA can ignore the Town's rules. In Riverhead the hearing is October 9th at 6 pm at the Riverhead Library. Attend if you want to be heard--Riverhead will get no water from the project but will have its roads ripped up for many months.

Materials are available at http://www.scwa.com/nfp



 
 
 

Recent Posts

See All
Does anyone need yard fill?

This is Charlie Agius at 167 Pier Ave. I am having a detached garage built on my property and I will be digging up quite a bit of soil that I do not need. Rather than haul it all away to a landfill I

 
 
 
A Spooky Invitation!

Please come! NBCA Halloween Themed Bash Cliff and Linda Steinkamp's 556 Sound Shore Road Saturday, October 24, 2026 5 pm Beverages will be provided! Please bring an hors d'oeuvres, preferably Hal

 
 
 

Comments


Post: Blog2 Post
bottom of page